Inflatables

Inflatable Obstacle Course Safety Checklist: Opening and Shift Handover

Use this printable inflatable obstacle course checklist to record who checked the course before opening, what changed at shift handover and who cleared any issue before reopening. Set the inspection criteria from the instructions for the exact model and the applicable venue and local requirements.

Opening inspection and sign-off

Record the date, site, unit ID, manual revision and inspector. Mark each row Pass, Hold or N/A. Give a reason for any N/A and attach the layout or photos used for verification.

CheckWhat to verify against the model instructionsResult / initials
Site and anchoringApproved surface, clearances, anchor locations and hardware. Check the actual setup against the approved arrangement.________
Air supply and powerSpecified blowers, connections and power supply. Check intakes and secure cables as required.________
Course conditionWalk the route and check seams, netting, transitions, entries and exits for damage, debris or a change in shape.________
Operating limitsPost the applicable participant and weather limits. Confirm queue layout, staffing positions and the method for monitoring conditions.________
Emergency responseBrief staff on entry control, clearing the course, communications and access for responders.________

Opening decision: Open / Hold. Inspector: ________ Time: ________ Supervisor or designated sign-off: ________.

Shift handover

Record handover time and the outgoing and incoming attendants. Review weather, occupancy controls, queue position, blower and anchor observations, and any deviation from the opening check. Recheck relevant items after layout, supply or weather changes according to the model instructions. Attach any maintenance or incident record.

Stop-use and return-to-service record

If a required check is unresolved, suspend entry and follow the site emergency procedure. Log the time, equipment ID, condition observed, immediate action and person notified. Keep the course out of service until the condition has been addressed and the required inspection or approval is recorded.

Issue: ________ Action taken: ________ Evidence or work order: ________ Rechecked by: ________ Reopening decision and time: ________.

Additional review for water-based courses

For a water installation, use the specific module and site documentation to review connections, anchoring, water depth, access and rescue arrangements before opening. Use the open-water aqua park setup guide for the broader site review.

See the commercial obstacle course buying guide when selecting equipment, or request model documentation before planning the inspection.

Planning to buy inflatables for your rental business or event?
Get a Free Quote WhatsApp